{"id":14072,"date":"2024-06-29T21:52:11","date_gmt":"2024-06-29T21:52:11","guid":{"rendered":"https:\/\/lonecandle.com\/?p=14072"},"modified":"2024-06-29T21:52:11","modified_gmt":"2024-06-29T21:52:11","slug":"7-5-billion-in-government-cash-only-built-8-e-v-chargers-in-2-5-years","status":"publish","type":"post","link":"https:\/\/lonecandle.com\/?p=14072","title":{"rendered":"$7.5 Billion in Government Cash Only Built 8 E.V. Chargers in 2.5 Years"},"content":{"rendered":"\n<p>&#8220;In 2021, the&nbsp;<a href=\"https:\/\/www.congress.gov\/bill\/117th-congress\/house-bill\/3684\/text\" target=\"_blank\" rel=\"noreferrer noopener\">Infrastructure Investment and Jobs Act<\/a>&nbsp;included $7.5 billion to build 500,000 public charging stations for electric vehicles (E.V.s) across the country in an effort to boost a switch to the use of clean energy.<\/p>\n\n\n\n<p>As&nbsp;<em>Reason<\/em>&nbsp;<a href=\"https:\/\/reason.com\/2023\/12\/08\/congress-spent-7-5-billion-on-e-v-chargers-after-2-years-none-are-built\/\" target=\"_blank\" rel=\"noreferrer noopener\">reported in December<\/a>, not one charger funded by the program had yet come online. Now, six months later, the number of functional charging stations has ticked up to eight.&#8221;<\/p>\n\n\n\n<p>&#8230;<\/p>\n\n\n\n<p>&#8220;Why so little progress? Alexander Laska of the center-left Third Way think tank told&nbsp;<em>Autoweek<\/em>&#8216;s Jim Motavalli that the federal cash &#8220;comes with dozens of rules and requirements around everything from reliability to interoperability, to where stations can be located, to what certifications the workers installing the chargers need to have.&#8221; Laska says the regulations &#8220;are largely a good thing\u2014we want drivers to have a seamless, convenient, reliable charging experience\u2014but navigating all of that does add to the timeline.&#8221;<\/p>\n\n\n\n<p>A spokesperson with the National Electric Vehicle Infrastructure (NEVI) program, which administers $5 billion of the $7.5 billion total, further told Motavalli that the delay is because &#8220;we want to get it right.&#8221;&#8221;<\/p>\n\n\n\n<figure class=\"wp-block-embed is-type-wp-embed is-provider-reason-com wp-block-embed-reason-com\"><div class=\"wp-block-embed__wrapper\">\n<blockquote class=\"wp-embedded-content\" data-secret=\"oiJijShaJE\"><a href=\"https:\/\/reason.com\/2024\/05\/30\/7-5-billion-in-government-cash-only-built-8-e-v-chargers-in-2-5-years\/\">$7.5 Billion in Government Cash Only Built 8 E.V. Chargers in 2.5 Years<\/a><\/blockquote><iframe loading=\"lazy\" class=\"wp-embedded-content\" sandbox=\"allow-scripts\" security=\"restricted\" style=\"position: absolute; clip: rect(1px, 1px, 1px, 1px);\" title=\"&#8220;$7.5 Billion in Government Cash Only Built 8 E.V. Chargers in 2.5 Years&#8221; &#8212; Reason.com\" src=\"https:\/\/reason.com\/2024\/05\/30\/7-5-billion-in-government-cash-only-built-8-e-v-chargers-in-2-5-years\/embed\/#?secret=P70E7pm5MB#?secret=oiJijShaJE\" data-secret=\"oiJijShaJE\" width=\"600\" height=\"338\" frameborder=\"0\" marginwidth=\"0\" marginheight=\"0\" scrolling=\"no\"><\/iframe>\n<\/div><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>&#8220;In 2021, the Infrastructure Investment and Jobs Act included $7.5 billion to build 500,000 public charging stations for electric vehicles (E.V.s) across the country in an effort to boost a switch to the use of clean energy.<br \/>\nAs Reason reported in December, not one charger funded by the program had yet come online. Now, six months later, the number of functional charging stations has ticked up to eight.&#8221;<\/p>\n<p>&#8230;<\/p>\n<p>&#8220;Why so little progress? Alexander Laska of the center-left Third Way think tank told Autoweek&#8217;s Jim Motavalli that the federal cash &#8220;comes with dozens of rules and requirements around everything from reliability to interoperability, to where stations can be located, to what certifications the workers installing the chargers need to have.&#8221; Laska says the regulations &#8220;are largely a good thing\u2014we want drivers to have a seamless, convenient, reliable charging experience\u2014but navigating all of that does add to the timeline.&#8221;<br \/>\nA spokesperson with the National Electric Vehicle Infrastructure (NEVI) program, which administers $5 billion of the $7.5 billion total, further told Motavalli that the delay is because &#8220;we want to get it right.&#8221;&#8221;<\/p>\n<p>https:\/\/reason.com\/2024\/05\/30\/7-5-billion-in-government-cash-only-built-8-e-v-chargers-in-2-5-years\/<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[13],"tags":[1504,1193,1247,1112,279],"class_list":["post-14072","post","type-post","status-publish","format-standard","hentry","category-article-share","tag-electric-vehicles","tag-government-spending","tag-infrastructure","tag-low-carbon-energy","tag-spending"],"_links":{"self":[{"href":"https:\/\/lonecandle.com\/index.php?rest_route=\/wp\/v2\/posts\/14072","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lonecandle.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lonecandle.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lonecandle.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/lonecandle.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=14072"}],"version-history":[{"count":1,"href":"https:\/\/lonecandle.com\/index.php?rest_route=\/wp\/v2\/posts\/14072\/revisions"}],"predecessor-version":[{"id":14073,"href":"https:\/\/lonecandle.com\/index.php?rest_route=\/wp\/v2\/posts\/14072\/revisions\/14073"}],"wp:attachment":[{"href":"https:\/\/lonecandle.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=14072"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lonecandle.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=14072"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lonecandle.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=14072"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}